Steel Heto Panel Formwork From Tecon

Product Details
Customization: Available
After-sales Service: on-Site Supervision
Material: Steel & Plywood
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
3 languages freely used by foreign trade staff. include: English, Spanish, Serbian
Experienced Team
The supplier has 15 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (24)
  • Steel Heto Panel Formwork From Tecon
  • Steel Heto Panel Formwork From Tecon
  • Steel Heto Panel Formwork From Tecon
  • Steel Heto Panel Formwork From Tecon
  • Steel Heto Panel Formwork From Tecon
  • Steel Heto Panel Formwork From Tecon
Find Similar Products

Basic Info.

Application
Concrete Pouring for Wall & Column
Technology
Automatic Welding
Process
Cut, Weld, Punch, Printing
Finish
Special Coating
Product Name
Steel Frame Concrete Formwork System for Concrete
Color
Red
Thickness
73
Surface Treatment
Powder Coated
Transport Package
by Pallet or as Cusomized
Specification
SGS
Trademark
TECON
Origin
China
HS Code
730840
Production Capacity
500000sqm/ Year

Product Description

FAQ
1. How to get a quotation?
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project
information for complete formwork & scaffolding proposal via below contacts.
 

2. What is the payment term?
By T/T or L/C.

3. Are you a factory ?
Yes, we are.

4. Do you have in stock ?
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.

 
5. What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.

6. What is the package method?
We have standard steel pallet, wooden pallet etc. which suits to container transportation.

7. Do you have any guarantee on the quality?
We have guarantees on the quality on different product basis.

8. Do you offer buy back system or rental business?
We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.

9. Do you have on-site supervision service?
Yes, we have on-site supervision service for most of our projects across the world except for a few restriction regions.

10
. What benefit we can get from TECON?
From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.

11. Are you looking for agent or distributor in our country?
Yes, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we'd be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.

12. How to purchase your formwork and scaffolding?
For any order you proceed with TECON will basically follow below steps.
Step 01. Confirm the PI based on our proposal after technical & commercial communication - by Customer, TECON Overseas Sales team and Technical team
Step 02. Make the deposit - by Customer
Step 03. Report on production schedule weekly until completion - by TECON Customer Care team
Step 04. Execute pre-shipment inspection - by Customer or Third Party Inspection company
Step 05. Effect the balance payment - by Customer
Step 06. Arrange the loading and shipment after balance payment - by TECON Customer Care team
Step 07. Submit the full set of shipping documents via courier after departure - by TECON Customer Care team
Step 08. Submit the full set of user manual, calculation, shop drawing and assembly drawings - by TECON Overseas Sales team
Step 09. Site supervision - By TECON Site Supervision team



 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier