Tecon Base 20 Engineered Timber Beams - Concrete-Ready Wall Formwork Solutions
Contact Supplier
Product Highlights
- Customized Concrete Pressure: Permits fresh concrete pressure up to 80kN/Sqm or customized to project needs.
- Customized Color Options: Available in Red or customized colors to match specific project requirements.
- Customized Standard & Packing: Standards and packing methods (pallet or customized) are fully adaptable.
- On-Site Supervision Service: Provided for most global projects, excluding specific restricted regions.
- High-Quality Timber Beam: Features imported Spruce/Pine flange with a usage life of around 2 years.
- Durable Steel Components: Steel parts made of Q235/Q355 with powder coated or galvanized finishes.
- 1-Year Warranty Coverage: Includes a comprehensive 1-year warranty for mechanical equipment.
- Extensive Stock Availability: Holds 5000 sqm plastic formwork, 2000 sqm frame formwork, and Alu-Flex in stock.
Product Attributes
- Customization
- Available
- After-sales Service
- on- Site Supervision
- Warranty
- 1 Year
- Model NO.
- TECON Base 20 Formwork
- Certification
- CE
- Material
- Timber
- Type
- Wall Formwork
- System Type
- Timber Wall Formwork
- Materials
- Imported Spruce Wood, H20 Timber Beam
- Formwork Weight
- 65 Kg/Sqm
- Max Unit Size
- 5×6 M
- Max One-Time Casting Height
- 12 M
- Max Bearing Capacity
- 90 kN/Sqm
- Installation Time
- 100 Sqm/Day/Unit (a Group 4-6 People)
- Formlining
- 18/21 mm Plywood
- Size and Shape
- Customized
- Handling Method
- Tower Crane
- Load Quantity
- Around 350 Sqm/40 Hq Container
- Transport Package
- by Pallet or as Cusomized
- Specification
- Customized
- Trademark
- TECON
- Origin
- China
- HS Code
- 730840
- Production Capacity
- 500000sqm/ Year
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Tecon Base 20 Engineered Timber Beams - Concrete-Ready Wall Formwork Solutions
Find Similar Products
Product Description







You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
2. What is the payment term?
By T/T or L/C.
3. Are you a factory ?
Yes, we are.
4. Do you have in stock ?
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
5. What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.
6. What is the package method?
We have standard steel pallet, wooden pallet etc. which suits to container transportation.
7. Do you have any guarantee on the quality?
We have guarantees on the quality on different product basis.
8. Do you offer buy back system or rental business?
We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.
9. Do you have on-site supervision service?
Yes, we have on-site supervision service for most of our projects across the world except for a few restriction regions.
10. What benefit we can get from TECON?
From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.
11. Are you looking for agent or distributor in our country?
Yes, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we'd be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.
12. How to purchase your formwork and scaffolding?
For any order you proceed with TECON will basically follow below steps.
Step 01. Confirm the PI based on our proposal after technical & commercial communication - by Customer, TECON Overseas Sales team and Technical team
Step 02. Make the deposit - by Customer
Step 03. Report on production schedule weekly until completion - by TECON Customer Care team
Step 04. Execute pre-shipment inspection - by Customer or Third Party Inspection company
Step 05. Effect the balance payment - by Customer
Step 06. Arrange the loading and shipment after balance payment - by TECON Customer Care team
Step 07. Submit the full set of shipping documents via courier after departure - by TECON Customer Care team
Step 08. Submit the full set of user manual, calculation, shop drawing and assembly drawings - by TECON Overseas Sales team
Step 09. Site supervision - By TECON Site Supervision team
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2441722". Items marked "" are certified.
Company Profile
Suzhou TECON Construction Technology Co., Ltd
TECON is a growing global manufacturer in the construction industry, specializing in formwork and scaffolding systems along with the development of technical solutions. We offer comprehensive services that include product R&D, design, production, delivery, and on-site supervision.
Our extensive product range includes various formwork systems such as wall, slab, beam, adjustable column, climbing systems, ring lock, kwikstage and heavy-duty support frames. Since our launch in 2013, TECON has been rapidly expanding its presence across North America, South America, the Middle East, Africa, and Southeast Asia, completing thousands of projects worldwide. Our OEM partnerships with leading international brands highlight the quality and competitiveness of our products.
As a Chinese formwork brand focused on global markets, TECON's professional project team implements advanced formwork systems, extensive design and application experience, efficient service, and a strong sense of responsibility to maximize our clients' economic benefits.
About Our Factory & Business Background
- Address
- 901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
- Terms of Payment
- LC, T/T
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, EXW
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays - Nearest Port
- Shanghai, Ningbo, Lianyungang
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2014-03-01
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
FAQ
- How to get a quotation?
- You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
- What is the payment term?
- By T/T or L/C.
- Are you a factory?
- Yes, we are.
- Do you have in stock?
- Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
- What is the lead time?
- For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
- What is the package method?
- We have standard steel pallet, wooden pallet etc. which suits to container transportation.
- Do you have any guarantee on the quality?
- We have guarantees on the quality on different product basis.
- Do you offer buy back system or rental business?
- We offer buy back system on some of medium and big scale projects, but we do not have any rental business yet.
- Do you have on-site supervision service?
- Yes, we have on-site supervision service for most of our projects across the world except for a few restriction regions.
- What benefit we can get from TECON?
- From TECON, you can get full range of advanced system with excellent quality, our know-how and in-time service. They will lead to increased productivity, labor saving and great cost down on your site as a result.
- Are you looking for agent or distributor in our country?
- Yes, we are looking for agent or distributor worldwide based on win-win relationship. If you have such experience, capability of investment, as well as business plan & goal, we'd be glad to discuss with you in details. TECON has its special agent and distributor policy waiting to support your success in formwork & scaffolding industry.
- How to purchase your formwork and scaffolding?
- For any order you proceed with TECON will basically follow below steps. Step 01. Confirm the PI based on our proposal after technical & commercial communication - by Customer, TECON Overseas Sales team and Technical team Step 02. Make the deposit - by Customer Step 03. Report on production schedule weekly until completion - by TECON Customer Care team Step 04. Execute pre-shipment inspection - by Customer or Third Party Inspection company Step 05. Effect the balance payment - by Customer Step 06
Send your message to this supplier
People who viewed this also viewed
-
US$110.00 / Square Meter
-
US$105.00 / Square Meter
-
US$690.00-730.00 / Set
-
US$75.00-130.00 / Square Meter
-
US$75.00-130.00 / Square Meter
-
US$75.00-130.00 / Square Meter
-
US$75.00-130.00 / Square Meter
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Formwork
- Wall Formwork
- Tecon Base 20 Engineered Timber Beams - Concrete-Ready Wall Formwork Solutions
Related Categories
Hot Searches
- Wall Material Factories
- Plastic Building Material
- Plastic Construction Material
- Timber Products Factories
- Formwork Building
- Beam Formwork System
- Construction Concrete Formwork
- Building Column Formwork
- Building Construction Concrete Formwork
- Formwork Bulkbuy