Tecon Steel Climbing Scaffolding Work Platform Formwork System

Product Details
Customization: Available
Certification: SGS
Material: Steel
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
3 languages freely used by foreign trade staff. include: English, Spanish, Serbian
Experienced Team
The supplier has 15 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (24)
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
  • Tecon Steel Climbing Scaffolding Work Platform Formwork System
Find Similar Products

Basic Info.

Model NO.
TECON climbing formwork
Type
Climbing Formwork
Trademark
TECON
Origin
Jiangsu
HS Code
8480600000
Production Capacity
3000 Square Meter / Year

Product Description

Overview
 
Quick Details
Place of Origin:  China                                    Brand Name:Tecon

Platform total height: 12m to 18m                   Platform width: 0.8m

Platform unit width: 2.4m, 2.0m, 1.8m, 1.5m

Scaffold floor material: 1.5mm riffled plate

Supporting span: ≤6.0m                                  Length of rack cantilever end: ≤2.4m

Lifting speed: 14cm/min                                  Electric hoist motor power: 0.5kw

Time required for climbing one floor: 0.5h to 2.0h

Dead weight of rack:  6.0 to 8.0kN/m
 
Product Description

Product Application

TECON Self-climbing Platform is the new external working platform for high-rise buildings. It provides site
crews with fully closed protection working area withhigh safety guarantee. Most importantly, it can climb by
itself rapidly without crane lift.

Tecon Steel Climbing Scaffolding Work Platform Formwork System
Tecon Steel Climbing Scaffolding Work Platform Formwork System

 
 
 
 
Main Features
1.High safety
Fully protected accessible platform
Reliable structural design, good welding and finishing quality
Steel based material, to avoid fire hazards
Anti-falling devices minimize the risks


2.Improved productivity
Easy erection
Once assembled in position, it can climb by itself without crane lift,
around 0.5 hours per floor
Only a few workers required for operation
Multiple usage in structural, plastering, painting etc



3.Cost efficiency
Do not need massive quantity of conventional scaffolding materials likesteel tubes and couplers
Lasting and durable thanks to the galvanized key components



4.Good company image
The external screen appears to be high-technology, tidy and good lookingfor company image, especially for important projects.

5.Customized solution to any structures

 
Core Parts
 

Main and
secondary platform

The main platform is used for walking,
and the seal plate is used to cover
gaps and prevent falling objects.

Tecon Steel Climbing Scaffolding Work Platform Formwork System
 

Electric hoist in use

The hoist is hung on the top hanging
point of the floor support, the bottom
hooks the sensor, and the bottom
end of the sensor hooks the bottom
hanging point.

Tecon Steel Climbing Scaffolding Work Platform Formwork System
 
 
 

Floor support

The floor support and the slab are connected by M30 bolts, and the anchor shoe is connected with the floor support by M30 bolts, and the guide rails pass through the anchor shoe.Tongue depressor and anti-fall block for safety protection
Tecon Steel Climbing Scaffolding Work Platform Formwork System
 

Protection screen

The protection screen and keel and
platform plate are connected by
bolts.

Tecon Steel Climbing Scaffolding Work Platform Formwork System
 
 
Assembly Process
 
Assembly Process
1
All system components have been
manufactured at factory according to
technical planning to specific project
2
The assembly could be done on the
ground level before installation, which is safe and convenient.
Tecon Steel Climbing Scaffolding Work Platform Formwork System
 
Assembly Process
3
One time hoisting work via tower crane
for initial installation.
4
Leave the self-climbing job to platform
itself afterwards, saves time, crane, and
improves productivity.
Tecon Steel Climbing Scaffolding Work Platform Formwork System


Our Service
 
 

Pre-Sales Service

* Inquiry and consulting support.
 

* Sample testing support. 
* View our Factory.
Tecon Steel Climbing Scaffolding Work Platform Formwork System

After-Sales Service

* Training how to assemble, training how to use the platform. 
* Engineers available to service  overseas.
Tecon Steel Climbing Scaffolding Work Platform Formwork System

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier